Mortar Calculator
Calculate exactly how many bags of mortar (80 lb, 60 lb, or 50 lb Quikrete / Amerimix) or bulk masonry cement and sand you need for concrete blocks (CMU), brickwork, tile thinset installations, and dry-pack floor mud beds.
Masonry, Brick & Tile Mortar Specs
Total Mortar Bags Needed
Exact: 8.00 bags (w/ 10% waste | 4.80 ft³)
How to Calculate How Much Mortar You Need
Whether you are laying 8×8×16 concrete masonry units (CMU blocks), building a clay brick veneer wall, setting ceramic floor tile with thinset, or screeding a dry-pack floor mud bed, estimating the right mortar quantity prevents costly job-site delays. Pre-blended mortar bags (such as Quikrete Mason Mix, Sakrete, or Amerimix) come ready to mix with water, while larger commercial walls use bulk 70 lb bags of Type S or Type N masonry cement mixed at a 1:3 ratio with washed masonry sand.
The Masonry & Tile Mortar Formulas
- CMU Concrete Blocks (8×8×16): Standard face-shell bedding with a 3/8-inch mortar joint requires 4.8 cubic feet of wet mortar per 100 blocks (including waste), which equals 8 bags of 80 lb pre-mixed mortar per 100 blocks (12.5 blocks per bag). For bulk mixing, masons use 3 bags (70 lb) of masonry cement + 9 ft³ (0.33 yd³) of masonry sand per 100 blocks.
- Standard / Modular Bricks: Laying 1,000 standard bricks with a 3/8-inch mortar joint requires approximately 5.2 to 5.4 cubic feet of wet mortar, which equals 9 bags of 80 lb pre-mixed mortar (or 12 bags of 60 lb mortar). One 80 lb bag lays 110 to 120 standard bricks.
-
Tile Thinset Mortar (50 lb Bags): Divide total tile square footage by the coverage rate of your notched trowel:
- 1/4″ × 1/4″ Trowel (Wall / Small Tile): ~90 sq ft per 50 lb bag (2 bags per 100 sq ft).
- 1/4″ × 3/8″ Trowel (12″×12″ Tile): ~65 sq ft per 50 lb bag (2 bags per 100 sq ft).
- 1/2″ × 1/2″ Trowel (Large Format 12″×24″+): ~45 sq ft per 50 lb bag (3 bags per 100 sq ft).
Mortar Coverage Chart: Blocks, Bricks & Tile Thinset
| Application / Unit Size | Yield per 80 lb Bag (0.60 ft³) | 80 lb Bags Needed | 60 lb Bags Needed | Bulk Cement (70lb) + Sand |
|---|---|---|---|---|
| 100 Standard 8×8×16 CMU Blocks | 12 to 13 Blocks / bag | 8 Bags | 11 Bags | 3 Bags Cement + 9 ft³ Sand |
| 2,000 Standard 8×8×16 CMU Blocks | 12 to 13 Blocks / bag | 160 Bags | 214 Bags | 60 Bags Cement + 6.7 yd³ Sand |
| 1,000 US Standard / Modular Bricks | 110 to 120 Bricks / bag | 9 Bags | 12 Bags | 7 Bags Cement + 21 ft³ Sand |
| 100 Sq Ft Tile Thinset (1/4″×3/8″ Trowel) | 60 to 70 sq ft / 50lb bag | 2 Bags (50 lb Thinset) | N/A | Pre-Blended Polymer Thinset |
| 100 Sq Ft Floor Mud Bed (1.5″ Thick) | 4.8 sq ft / 80lb bag @ 1.5″ | 23 Bags | 31 Bags | 3 Bags Portland + 14 ft³ Sand |
Mortar Calculator Frequently Asked Questions
How do you calculate how much mortar you need?
For standard 8×8×16 concrete blocks, divide your total block count by 12.5 to get the number of 80 lb pre-mixed mortar bags (or multiply by 0.08). For standard bricks, multiply total bricks by 0.009 to get 80 lb bags (9 bags per 1,000 bricks). Always include a 10% allowance for mortar droppings and waste.
How many square feet does a 50 lb bag of mortar do?
A 50 lb bag of tile thinset mortar covers 80 to 95 sq ft using a 1/4″×1/4″ notched trowel, 60 to 70 sq ft using a 1/4″×3/8″ trowel, or 40 to 45 sq ft using a 1/2″×1/2″ large-format trowel. If using a 50 lb bag of masonry mortar (0.375 ft³ yield) for walls, it covers roughly 70 bricks (~10.5 sq ft) or 8 concrete blocks (~7 sq ft).
How much thinset mortar do I need for 100 square feet?
For 100 square feet of tile, you need 2 bags of 50 lb thinset mortar when using a standard 1/4″×1/4″ or 1/4″×3/8″ notched trowel. If you are installing large-format tiles (12″×24″ or larger) with a 1/2″×1/2″ trowel and back-buttering the tiles, you will need 3 bags of 50 lb thinset.
How many bags of mortar do I need for 100 blocks?
To lay 100 standard 8×8×16 CMU blocks with a 3/8-inch mortar joint, you need 8 bags of 80 lb pre-mixed mortar (or 11 bags of 60 lb pre-mixed mortar). If mixing bulk mortar on-site, you need 3 bags of 70 lb masonry cement and 9 cubic feet of masonry sand.
How much cement to lay 100 blocks?
When mixing bulk mortar on-site at a standard 1:3 cement-to-sand ratio, you need 3 bags (70 lb each) of Type S or Type N masonry cement and 9 cubic feet (0.33 cubic yards) of masonry sand to lay 100 concrete blocks.
How many bags of mortar does it take to lay 1000 bricks?
Laying 1,000 standard modular bricks with a 3/8-inch joint requires 8 to 9 bags of 80 lb pre-mixed mortar, or 11 to 12 bags of 60 lb pre-mixed mortar. If mixing from bulk masonry cement and sand, you need 7 bags of 70 lb masonry cement and 21 cubic feet of sand.
Should I use type S or type N mortar?
Use Type S mortar (1,800+ PSI) for structural load-bearing block walls, below-grade foundations, retaining walls, and exterior masonry steps. Use Type N mortar (750 PSI) for above-grade exterior brick veneer, chimneys, and interior non-load-bearing partitions where flexibility prevents brick cracking.
How many bags of cement can build 2000 blocks?
To lay 2,000 standard 8×8×16 concrete blocks using bulk field-mixed mortar (at 3 bags of cement per 100 blocks), you need 60 bags of 70 lb masonry cement mixed with 180 cubic feet (6.7 cubic yards) of masonry sand. If using pre-blended 80 lb mortar bags instead, 2,000 blocks require 160 bags of 80 lb mortar mix.
How many bricks per 80 lb bag of mortar?
One 80 lb bag of pre-mixed mortar yields 0.60 cubic feet of wet mortar and lays 110 to 120 standard modular bricks with a 3/8-inch joint (or 12 to 13 standard 8×8×16 concrete blocks).
Calculation Methodology
This calculator adheres to ASTM C270 mortar proportion specifications, NCMA TEK 9-1A block bedding yields, and ANSI A108 thinset coverage standards. Pre-mixed bag yields are calculated at 0.60 ft³ per 80 lb bag, 0.45 ft³ per 60 lb bag, and 0.375 ft³ per 50 lb bag.
Accuracy & Limitations
- Core-Fill Grout Separate: Block mortar estimates cover horizontal bed and vertical head joints only. Hollow cells requiring structural rebar grouting should be calculated separately.
- Pot Life Warning: Discard any masonry mortar that has stiffened after 2.5 hours of initial mixing; retempering old mortar reduces compressive bond strength.
- Disclaimer: Estimates are for material planning only and do not substitute for structural masonry engineering specifications.
Found an issue with this calculator or its math? Report a correction.
Check Other Concrete Calculators: