Calculate exactly how many footings and support posts your deck needs, the optimal post and beam spacing, the IRC code-required footing diameter based on soil bearing capacity, and the exact number of 80 lb, 60 lb, or 50 lb concrete bags required.
Deck Dimensions, Spacing & Footing Specs
Total Deck Footings & Concrete Needed
Requires 16 bags (80 lb) | 1 Beam Line × 3 Posts
How to Calculate Deck Footings, Post Spacing & Concrete Bags
Designing a safe, code-compliant deck starts underground. Every pound of live load (people, furniture, snow, or a hot tub) and dead load (joists, decking boards, and beams) transfers down through your vertical 4×4 or 6×6 posts into your concrete deck footings. If your footings are spaced too far apart, undersized in diameter for your soil bearing capacity, or poured above the local frost line, the deck will settle unevenly, heave during winter freezes, or pull away from the house ledger board.
Our deck footing calculator combines an IRC-compliant deck post spacing calculator, a tributary load footing size calculator, and a concrete bag estimator in one tool.
The 4-Step Deck Footing & Sizing Formula
- Determine Number of Beam Lines: An attached ledger-board deck extending up to 14–16 feet outward from the house typically uses 1 drop beam line near the outer edge (supported by the house ledger on the inside). Decks projecting more than 16 feet—or any freestanding / floating deck—require 2 or more parallel beam lines.
-
Calculate Posts per Beam: Divide the deck width (along the house) by your maximum allowable post spacing (typically 6 ft to 8 ft on-center), round up, and add 1 for the starting end post:
Posts per Beam = Ceiling(Deck Width ÷ Max Post Spacing) + 1 - Calculate Required Footing Diameter (IRC Table R507.3.1): Multiply the Tributary Area supported by a single interior post (Post Spacing × Half the Joist Span) by the Total Deck Load (50 PSF standard = 40 PSF live + 10 PSF dead) to get the Post Load in lbs. Divide Post Load by your Soil Bearing Capacity (1,500 PSF default for clay) to find the required base area in square feet, then convert to circular diameter.
- Convert Footing Volume to Concrete Bags: Multiply the circular cross-sectional area (3.1416 × Radius²) by the frost depth in feet to get cubic feet per hole, multiply by total footings, and divide by 0.60 ft³ for 80 lb bags (or 0.45 ft³ for 60 lb bags).
Deck Footing Size Chart & Post Count by Deck Size (IRC 2026)
How many footings do you need for a 12×12, 12×16, or 20×20 deck? The chart below compares standard attached ledger decks versus freestanding floating decks, showing total footings, tributary post loads (at 50 PSF total load on 1,500 PSF soil), minimum footing diameter, and 80 lb concrete bags required (at 42″ frost depth with 10% waste):
| Deck Dimensions | Attached Deck (Ledger) | Freestanding Deck | Post Spacing (O.C.) | Min Footing Dia (1,500 PSF) | 80 lb Bags (12″×42″ Tubes) |
|---|---|---|---|---|---|
| 10×10 Deck (100 sq ft) | 3 Footings (1 Beam) | 6 Footings (2 Beams) | 5.0 ft O.C. | 12″ Diameter | 16 Bags (Attached) / 31 (Free) |
| 12×12 Deck (144 sq ft) | 3 Footings (1 Beam) | 6 Footings (2 Beams) | 6.0 ft O.C. | 12″ to 14″ Diameter | 16 Bags (Attached) / 31 (Free) |
| 12×16 Deck (192 sq ft) | 3 or 4 Footings (1 Beam) | 6 or 8 Footings (2 Beams) | 5.3 ft to 8.0 ft O.C. | 14″ Diameter | 16 to 21 Bags (Attached) |
| 12×20 Deck (240 sq ft) | 4 Footings (1 Beam) | 8 Footings (2 Beams) | 6.7 ft O.C. | 14″ Diameter | 21 Bags (Attached) / 41 (Free) |
| 16×20 Deck (320 sq ft) | 4 to 8 Footings (1–2 Beams) | 8 to 12 Footings (2–3 Beams) | 6.7 ft O.C. | 16″ Diameter | 36 to 41 Bags |
| 20×20 Deck (400 sq ft) | 8 Footings (2 Beams × 4) | 12 Footings (3 Beams × 4) | 6.7 ft O.C. | 16″ to 18″ Diameter | 41 Bags (Attached) / 61 (Free) |
Deck Joist & Beam Span Rules (2×8 vs. 2×10 & 6×6 Post Spacing)
2×8 vs. 2×10 Deck Joists
Under IRC Table R507.6 (Southern Pine / Douglas Fir #2 at 16″ O.C.), 2×8 joists can span up to 11′ 10″ to 12′ 6″ between the ledger and beam (plus up to a 2′ cantilever). 2×10 joists can span up to 14′ 0″ to 15′ 8″ and feel significantly stiffer underfoot with zero bounce.
6×6 Post & Beam Spacing
How far apart can 6×6 posts be for a deck? The post spacing is limited by the beam size sitting on top of the 6×6 posts. For a 12-foot joist span, a 2-ply 2×10 beam allows posts up to 7′ 0″ apart; a 3-ply 2×10 beam allows posts up to 8′ 6″ apart; and a 3-ply 2×12 beam spans up to 10′ 0″ between 6×6 posts.
The 3-4-5 Squaring Rule
Before digging footing holes, use the 3-4-5 right-triangle rule to square your layout stringlines with the house: measure 3 feet along the ledger board and 4 feet out along the side batter line. When the diagonal between those two marks measures exactly 5 feet (or 6-8-10 / 9-12-15 ft), your corner is a perfect 90° angle.
Frequently Asked Questions
How do I calculate the footing size for my deck?
Multiply the Tributary Area of your most heavily loaded post (Post Spacing in ft × Tributary Joist Span in ft) by your Total Deck Design Load (typically 50 PSF = 40 PSF live load + 10 PSF dead load) to find the total downward load in pounds. Divide that load by your local Soil Bearing Capacity (1,500 PSF default for clay soil) to get the required footing base area in square feet, then convert to inches to select your Sonotube or footing pad diameter.
How many footings for a 20×20 deck?
An attached 20×20 deck (supported by a house ledger board on one side) typically requires 8 footings arranged across 2 parallel drop beams (an intermediate beam at 10 ft and an outer beam at 18–20 ft, with 4 posts per beam spaced 6.67 ft apart). If the 20×20 deck is freestanding (floating), it requires 12 footings (3 beam lines × 4 posts per beam).
How many footings do I need for a 12×12 deck?
An attached 12×12 deck bolted to a house ledger board requires 3 footings along a single outer drop beam (spaced 6 feet apart on-center: two corner posts and one center post). A freestanding 12×12 deck requires 6 footings (2 parallel beams with 3 posts each).
How far apart should my deck footings be?
Deck footings are typically spaced 6 to 8 feet apart on-center along the beam line, and beam lines are spaced 8 to 14 feet apart depending on your joist size. Never exceed 8 feet between footings without an engineered 3-ply 2×12 or LVL beam, and always check IRC Table R507.5 for your lumber species and snow load.
How many footings for a 12×16 deck?
For an attached 12×16 deck (16 feet wide along the house and extending 12 feet out), you need 3 footings if using a 3-ply 2×10 beam with posts spaced 8 feet apart, or 4 footings if using a 2-ply 2×10 beam with posts spaced 5.3 feet apart. For a freestanding 12×16 deck, double that count to 6 or 8 footings across two beams.
What is the 3/4/5 rule deck?
The 3-4-5 rule is a carpenter’s Pythagorean geometry trick (3² + 4² = 5²) used to ensure your deck framing and footing layout are perfectly square (90 degrees) to the house. Measure 3 feet along the ledger board and mark it; measure 4 feet out along the side rim joist or stringline and mark it. Adjust the stringline until the diagonal tape measurement between the two marks is exactly 5 feet (or use multiples like 6-8-10 feet or 9-12-15 feet for larger decks).
Do I need 2×8 or 2×10 joists for my deck?
Use 2×8 joists (spaced 16″ on-center) if your joist span between the ledger and drop beam is 10 to 12 feet or less. Upgrade to 2×10 joists if your deck projects 12 to 15 feet between supports, if you plan to cantilever the joists up to 24 inches past the drop beam, or if you want a rock-solid deck floor with zero springiness.
How far apart can 6×6 posts be for a deck?
6×6 deck posts are typically spaced 6 to 8 feet apart on-center, and can be spaced up to 10 to 12 feet apart only when supporting a heavy triple 2×12 beam over a short 6-to-8-foot joist span. The spacing of 6×6 posts is governed by the bending capacity of the horizontal beam resting on top of the posts and the bearing capacity of the concrete footing underneath.
Do decks need blocking between joists?
Yes. Building codes (IRC R507.6.2) require solid full-depth blocking between joists directly over every drop beam location to prevent the joists from twisting or rolling sideways under load. In addition, installing mid-span bridging/blocking every 8 feet on joists spanning more than 10 feet eliminates floor bounce, prevents composite decking boards from waving, and stiffens the entire deck frame.
Calculation Methodology
This calculator adheres to the International Residential Code (IRC Section R507) and American Wood Council DCA 6 (Prescriptive Residential Wood Deck Construction Guide). Tributary post loads are computed from post on-center spacing and joist span, divided by soil bearing capacity (1,500 to 4,000 PSF) to determine minimum footing diameter. Concrete bag counts follow ASTM C387 yields (0.60 ft³ per 80 lb bag).
Accuracy & Limitations
- Local Frost Line Compliance: Always verify your municipality’s required frost depth (typically 36″ to 48″ in northern states) and minimum footing thickness (at least 6″ to 8″ thick concrete pad at the base).
- 6×6 Post Base Clearance: A 6×6 post (5.5″×5.5″ actual = 7.78″ diagonal) requires at least a 12-inch or 14-inch diameter Sonotube so the metal post base anchor bolt has sufficient concrete edge clearance.
- Disclaimer: Estimates are for material planning and budgeting only and do not substitute for local building department permit drawings.
Found an issue with this calculator or its math? Report a correction.
Check Other Concrete Calculators: