Concrete Square Footage Calculator
Calculate exactly how much ready-mix or bagged concrete you need based on the square footage of your slab, patio, or driveway. Estimate material volumes, pricing per square foot, and total installation costs.
Area & Dimensions
The Ultimate Concrete Square Footage Calculator Guide
When contractors and homeowners plan a new driveway, patio, or foundation slab, the very first metric discussed is always the Square Footage. Knowing your square footage dictates everything from the amount of concrete you must order to the linear feet of rebar you need, and ultimately, the final bid from your concrete finisher.
Our concrete square footage calculator simplifies this process. By inputting either your Length and Width, or entering a pre-calculated total square footage, the tool instantly processes the desired depth and converts your flat 2D area into the 3D Cubic Yards required by ready-mix dispatchers. It also generates an accurate bagged concrete equivalent and full project cost estimate.
How to Calculate Concrete Square Footage to Cubic Yards
Concrete is poured into a 3D space, which means measuring just the flat square footage is not enough. You must calculate the volume by multiplying the square footage by the thickness of the pour. The most important rule to remember is that all measurements must be converted to feet before doing the math.
- Calculate Square Footage (Area): Multiply Length × Width in feet. (e.g., A 20 ft by 30 ft slab = 600 sq ft).
- Convert Depth to Feet: A standard slab is 4 inches thick. Divide 4 by 12 to get feet (4 ÷ 12 = 0.333 feet).
- Calculate Cubic Feet (Volume): Multiply the Square Footage by the Depth in feet. (600 sq ft × 0.333 ft = 200 cubic feet).
- Convert to Cubic Yards: There are exactly 27 cubic feet in one cubic yard. Divide your total volume by 27. (200 ÷ 27 = 7.4 cubic yards).
- Add Waste: Always add a 10% waste factor for uneven grading and formwork spillage. (7.4 × 1.10 = 8.14 Cubic Yards to order).
Common Concrete Square Footage Cost Estimates
A frequent question from homeowners is, “How much does a concrete slab cost per square foot?” As of late 2026, the national average for a standard 4-inch broom-finished concrete slab is roughly $7.50 to $11.00 per square foot fully installed. This includes the ready-mix material, minor grading, forming, and finishing labor.
| Square Footage | Common Application | Concrete (4″ Depth w/ Waste) | Estimated Total Cost |
|---|---|---|---|
| 100 sq ft | 10×10 Shed Pad | 1.35 yd³ | ~ $850 – $1,100 |
| 144 sq ft | 12×12 Patio | 1.95 yd³ | ~ $1,150 – $1,450 |
| 280 sq ft | 14×20 Single Car Pad | 3.80 yd³ | ~ $2,200 – $2,800 |
| 300 sq ft | Large Patio / Walkway | 4.07 yd³ | ~ $2,400 – $3,000 |
| 700 sq ft | Large Driveway Extension | 9.50 yd³ | ~ $5,600 – $7,000 |
| 1,500 sq ft | Pole Barn Floor | 20.37 yd³ | ~ $11,000 – $14,000 |
| 2,000 sq ft | House Foundation Slab | 27.16 yd³ | ~ $15,000 – $19,000 |
How much would a 14×20 concrete slab cost?
A 14×20 dimension yields 280 square feet. If you are pouring it at a standard 4-inch depth to park a single vehicle, you will need approximately 3.8 cubic yards of ready-mix concrete. At an average installed rate of $9.00 per square foot, you should expect to pay a contractor roughly $2,500 for a completed 14×20 pad.
Is It Cheaper to Mix and Pour Your Own Concrete?
If you are calculating square footage for a small project, you might debate buying bags of concrete versus ordering a delivery truck. If your project is under 1.5 cubic yards (roughly 120 square feet at 4 inches thick), mixing your own bags in a wheelbarrow is drastically cheaper.
Why? Because ready-mix concrete suppliers usually charge a steep “short load fee” for any delivery under 3 or 4 yards. For example, 1 cubic yard of concrete might cost $150. But if the supplier adds a $150 short load fee and a $50 fuel surcharge, your 1 yard delivery just cost $350. Buying 45 bags of 80lb concrete from a hardware store would only cost roughly $250 with zero delivery fees.
However, for any slab over 150 square feet, attempting to mix bags by hand is physically exhausting. Furthermore, if you take too long to mix the bags, the first section of the slab will cure before you pour the final section, creating a weak “cold joint” that will eventually crack.
Frequently Asked Questions
How much concrete to pour 100 square feet?
To pour a 100 sq ft slab at a standard 4-inch depth, you will need 1.23 cubic yards of concrete (which equates to exactly fifty-six 80lb bags). If you pour it thicker at 6 inches deep, you will need 1.85 cubic yards.
How many yards of concrete do I need for a 12×12?
A 12×12 patio equals 144 square feet. At 4 inches thick, the raw volume is 1.77 cubic yards. With a 10% waste factor applied for spillage and uneven ground, you should order exactly 2 cubic yards.
How much is a 2 yard truck of concrete?
While the material cost for 2 yards is roughly $300 (assuming $150/yd), almost all suppliers will hit you with a “short load penalty” since the truck’s capacity is 10 yards. Expect a 2-yard delivery bill to total roughly $450 to $550 once delivery fees and surcharges are applied.
How much does it cost to lay 100 sq ft of concrete?
If you DIY a 100 sq ft pad using 80lb bags from a hardware store, the materials will cost under $300. If you hire a professional contractor, they typically charge a minimum daily rate, meaning a small 100 sq ft pad will often cost $850 to $1,100.
What is poor man’s concrete?
“Poor man’s concrete” refers to the highly discouraged method of dumping dry concrete mix directly onto the ground and soaking it with a hose from the top down, rather than pre-mixing it with water in a wheelbarrow. Because the cement powder does not hydrate evenly, it produces weak concrete that will quickly crack and crumble.
Calculation Methodology
This tool calculates volume based on exact standard geometric equations (Square Footage × Depth in Feet). Conversions strictly dictate that 27 cubic feet equal 1 cubic yard. The bagged equivalents rely on the ASTM C387 baseline yield of 0.60 ft³ per 80lb bag.
Accuracy & Limitations
- Subgrade Variances: Theoretical math assumes a perfectly flat, level subgrade. If your gravel base has dips or if your forms bow outward when filled, the slab will consume more concrete than the square footage calculation dictates.
- Thickened Edges: This calculator assumes uniform thickness. If you are pouring a “monolithic” slab with thickened outer edges for load-bearing walls, you must calculate that extra volume separately.
- Disclaimer: This tool provides material and labor estimation baselines only. Always source three local bids before starting a major pour.
Found an issue with this calculator or its math? Report a correction.